100MW Battery Storage Planning Success
Cottingham
At a glance
- Client
- Harmony Energy Storage Limited
- Sector
- Energy & Marine
- Location
- Cottingham
- How we helped
- Energy
- Statistics
- 100MW of import and export capacity
The Carter Jonas Energy team have contributed to the successful buildout of a 100MW Tesla battery storage scheme near Hull, one of the largest schemes in Europe.
After initially being contacted by the owners of the 70-acre farm to help dispose of the asset, Head of Energy Charles Hardcastle and his team advised the site had untapped potential being located adjacent to a major National Grid and Distribution Network substation. After an initial planning screen of the site, we recommended the opportunity for a generation or battery storage development should be explored.
An application was submitted to Northern Powergrid and we secured a connection offer for 100MW of import and export capacity in the landowner’s name. We then marketed and promoted approximately 12 acres of the farm to battery operators and secured competitive bids for the site, before advising our client in entering an option and ultimately a long lease with the preferred developer, Harmony Energy.
Carter Jonas’ Energy Planning team was then instructed by the developer to secure planning permission for the proposed development. This included pre-application advice, survey coordination, the preparation and submission of the application and discharge of conditions. Challenges successfully overcome include flood risk and access.
An application was submitted to Northern Powergrid and we secured a connection offer for 100MW of import and export capacity in the landowner’s name. We then marketed and promoted approximately 12 acres of the farm to battery operators and secured competitive bids for the site, before advising our client in entering an option and ultimately a long lease with the preferred developer, Harmony Energy.
Carter Jonas’ Energy Planning team was then instructed by the developer to secure planning permission for the proposed development. This included pre-application advice, survey coordination, the preparation and submission of the application and discharge of conditions. Challenges successfully overcome include flood risk and access.